The meter on the wall
SP and your LEW check the physical meter: its identity, type and suitability for the required solar import/export arrangement. Meter work may be needed.
SEPARATE FROM YOUR PERMIT · START EARLY
Going solar? Ask them to check the meter and the account setting.
Both need to suit your agreed solar arrangement.
MOC means Meter Option Change. If your retailer account needs to move from SRLP to AMI metering, your current retailer submits the request to SP. Your installer helps you prepare—but does not submit the retailer’s transaction.
If the AMI account option is already active, another MOC may not be needed. Ask the retailer to confirm; do not request a duplicate change.
SP and your LEW check the physical meter: its identity, type and suitability for the required solar import/export arrangement. Meter work may be needed.
Your retailer checks whether the account uses AMI actual half-hourly readings or the SRLP load-profile option. MOC changes this account option.
A smart meter does not prove the account is on AMI. A meter can already be installed while the account still uses a load profile. The retailer confirms the account record; a meter photo or app screen alone does not.
AMI — Advanced Metering Infrastructure: the smart-meter system; the AMI account option uses actual half-hourly consumption readings.
SRLP — Static Residential Load Profile: a standard household pattern is used to spread monthly consumption into estimated half-hourly amounts for settlement. It is an account option, not proof of which meter is on the wall.
Why ask about MOC? For your agreed solar setup, the retailer and LEW need the correct account option as well as suitable metering. If the account is on SRLP and AMI is required, ask the retailer to submit that change.
“Software” here means the account / settlement record—not an app download or a homeowner firmware update. Physical meter work, MOC, SP permits and export registration are different tasks.
Do this alongside the permit process. This guide does not add a fixed number of days to your permit estimate.
The directory covers all seven providers currently listed in the residential OEM directory, plus SP Services separately. It is not a list of every business-only electricity licensee.
Contact numbers checked against official provider pages on 5 November 2026. These are customer-service / enquiry channels, not dedicated MOC numbers. Plan availability and eligibility must be confirmed directly.
SEPARATE STEP · EXPORT PAYMENTS
NER means Net Export Rebate. It is the application to SP Services for payment for surplus solar sent to the grid—not a permit or a fixed payment rate.
Simplified Credit Treatment pays the regulated tariff less grid charges.
Enhanced Central Intermediary Scheme pays prevailing half-hourly wholesale prices, which vary—not your retail purchase rate.
Have your utility account number, premises details and system capacity ready. The LEW supplies technical / meter details. GST-status evidence and a separate GIRO form may be needed, depending on the application and payment method.
MOC completion or an SP inspection pass does not, by itself, activate export payments. No NER processing time is added to this planner.
Keep these separate:
Do not assume a completed MOC means export payments have started—or that you may switch the solar system on.
Back to your permit timeline →The residential directory displayed seven providers when checked: Flo, Geneco, Keppel Electric, PacificLight, Sembcorp Power, Senoko Energy and Tuas Power. Flo’s own support page describes home supply as coming soon; the directory listing is not a promise that it accepts new home accounts.
SP’s market-participant manual, section 3.9, defines a residential MOC as a retailer-initiated switch between AMI and SRLP. For a customer buying at SP’s regulated tariff, use SP’s metering / solar enquiry process rather than describing it as an OEM retailer MOC.
The hardware / account-setting distinction follows OEM’s metering-options guidance, which permits an installed advanced meter to be used with either actual interval data or a load profile. The solar-specific action here is practical guidance: the retailer and LEW must confirm the applicable arrangement. No universal fee or completion time is promised.
Source review: 5 November 2026. Live retailer terms, SP requirements and the appointed LEW govern. No existing public Sunollo article has been changed.