⚡ Live: Meralco residential rate hit PHP 13.82/kWh this quarter — solar payback is now under 5 years for most Philippine homes.

🇵🇭 Solar Philippines

Your Meralco Bill Is a 25-Year Bet. Take the Other Side.

PHP 13.82/kWh and climbing. Solar lets you lock in your rate today — and start saving from month one. $0 upfront, 25-year warranty, Sunollo-managed for life.

✓ $0 Upfront
✓ SunolloCare™
✓ 25-Year Warranty
✓ Battery backup options

PHP 13.82

Meralco residential rate per kWh — up 28% since 2021

4–6 yrs

Solar payback period for Philippine homes — then 19+ years of near-free power

60–70%

Average monthly electricity bill reduction with a properly sized Sunollo solar system

Why 2026 Is the Tipping Point for Solar in the Philippines

Electricity prices keep climbing. Solar costs keep falling. The crossover happened — and Sunollo is here to help Philippine homeowners act on it.

Go Solar in 3 Steps — We Handle Everything Else

No engineering degrees required. No surprise bills. No chasing contractors. Sunollo manages the full journey from assessment to lifetime support.

Free Home Assessment

Our Philippines solar specialists assess your roof, Meralco bills, and usage profile. We size a system that maximises savings for your exact home.

We Install. You Relax.

Sunollo-certified teams handle permits, meralco grid connection paperwork, installation, and commissioning. Typical install: 1–2 days. Zero hassle on your end.

Save. Track. Sleep Well.

Watch your savings in real time via LiveTrack™. SunolloCare™ handles every maintenance call. If anything underperforms, we fix it — proactively, not when you notice.

The Solar Company That Runs Like a Subscription Service

Most solar companies install and disappear. Sunollo stays — managing performance, handling issues, and ensuring your system earns back every peso it promised.

This is some text inside of a div block.

$0 Upfront — Seriously

No down payment. No bank loan required. Sunollo finances the system and you pay from the savings it generates.

This is some text inside of a div block.

Brownout-Proof Battery Add-On

Add a home battery and keep essential appliances running through even Meralco outages. Philippines-grade power reliability.

This is some text inside of a div block.

LiveTrack™ Monitoring

Real-time generation data, savings dashboard, and alerts on your phone. Know exactly what your solar system is earning, every hour.

This is some text inside of a div block.

SunolloCare™ for Life

Maintenance, cleaning, inverter checks — all included. We don’t wait for you to report a problem. We detect and fix it before you notice.

This is some text inside of a div block.

NEM-Ready Net Metering

Sunollo handles the entire NEM application with Meralco or your local DISCO. Export excess power. Get credits. We’ll manage the paperwork.

This is some text inside of a div block.

25-Year Performance Warranty

If your panels produce less than promised, Sunollo compensates the difference. The only solar warranty in the Philippines backed by a service guarantee.

⚡ Philippines-Specific

Brownouts Are a Philippine Reality. Your Solar System Doesn’t Have to Be.

The Philippines averages 5–8 hours of power interruptions annually in many provinces. Add a Sunollo home battery and you’re protected. Lights stay on. The ref stays cold. The WiFi keeps running. Your solar keeps generating — and charging your battery — even when Meralco goes down.

Add Battery Backup →

Everything Philippine Homeowners Ask Before Going Solar

Can I get net metering with Meralco?

Yes. Under the Philippines Net Metering Act (RA 9513), homeowners can export excess solar power and receive bill credits. Sunollo manages the entire NEM application process — you just sign.

What happens during brownouts?

A standard grid-tied solar system shuts off during outages for safety. Add a Sunollo battery and you stay powered. Essential circuits — lights, fans, WiFi, ref — keep running regardless of what Meralco is doing.

What if my roof isn’t south-facing?

In the Philippines, due to the country’s location near the equator, both south and north-facing roofs perform well. Our engineers assess your specific roof and optimize panel placement with SunMax™ technology for maximum yield.

How long does installation take?

A typical residential installation takes 1–2 days. From first assessment to system going live, the full process is typically 4–6 weeks, including permits and Meralco grid connection approval.

Stop Renting Electricity. Own Your Power.

Join Philippine homeowners who are locking in their energy rate today. Free assessment. No obligation. $0 upfront. Just savings.

Book my free Philippines solar assessment